Construction-related

Doureki Kogyo, Co., Ltd.

Asahi-bashi-dori Road improvement project, including roadbed and pavement work with a subsidy

Road and River Section, Urban Development Department, Kushiro City

Commendation for Outstanding Construction Project

Construction period

From July 8, 2014, to December 10, 2014

Outline of the construction

Length of construction site = 107.5 m Road width = 18.00 m (vehicle lane width = 9.0 m Pedestrian lane width = 4.50 m x 2)
Base course in vehicle lanes = 1,006 m² Base course in pedestrian lanes = 13 m²
Area of the binder course of vehicle lanes = 1,017 m² and surface course = 1,028 m² Area of the surface course of pedestrian lanes = 759 m²
Length of pavement markings drawing using melting method : 6.0 m Lengths of solvent-based paint lane marking: Broken lines = 56 m Solid lines = 208 m

Reason for the award

This construction site was located on a busy arterial road. Because of its use as a bus route and proximity to multiple high schools, this road experiences heavy traffic, both vehicular and pedestrian. The construction was completed without any accidents or complaints in this challenging environment, deserving commendation. Government agencies praised the outstanding progress and quality management achieved in this construction environment.

Photo of the site
Photo of the site
Certificate of Commendation
Return to List