Construction-related
Asahi Industries Co., Ltd.
Pavement work in the Tanigawa area (from Saiki to Kamae) of the Higashi Kyushu Expressway
Saiki River and National Highway Office
Commendation for Head of Excellent Construction Office
Construction period
From May 21, 2014, to February 28, 2015
Outline of the construction
[Length of construction]
– Section A length = 660 m – Section B length = 260 m – Front section length = 60 m Total length = 980 m
[Detail of construction]
Road civil engineering: Volume of road topsoil = 5,960 m3 / Volume of subgrade soil = 5,480 m3 Slope construction = one set Soil improvement = one set
Pavement construction: Subbase course construction = 16,000 m2 / Area of binder course construction = 15,800 m2 / Area of surface course installation work = 15,550 m2
Construction of water drainage structure : one set Curbstone installation : one set Pedestrian bridge installation : one set Protective fence installation : one set Road facility installation : one set
Erosion control weir and channel construction : one set
Reason for the award
This project involved constructing new pavement on the Higashi Kyushu Expressway between Saiki and Kamae, commissioned by the Saiki River and the National Highway Office. The Expressway was scheduled to open in March 2015. The construction section involved tunnel construction at two sites and erosion control dam construction at three sites, requiring coordination with other construction projects. Therefore, a weekly progress meeting was conducted to ensure proactive planning and coordination.
The Safety Council chair facilitated coordination and communication across various construction projects. Originally contracted for pavement construction, the project additionally involved building weirs and water channels for erosion control dams after amending the contract. These tasks were completed successfully before the Expressway’s opening day, leading to high praise and an award.