Construction-related

Doureki Kogyo, Co., Ltd.

Pavement improvement work on the Hoshigaura Kita 1 Line 1

Road and River Section, Urban Development Department, Kushiro City

Commendation for Outstanding Construction Project

Construction period

From June 7, 2016, to September 9, 2016

Outline of the construction

Length of construction site = 84.00 m  Road width = 10.00 m  Vehicle lane width = 6.00 m  Pedestrian lane width = 2.00 x 2 = 4.00 m

Reason for the award

This construction site was situated on a road in a residential area lined with leasing firms, pachinko stores, and other facilities. Local residents were informed about the construction in advance, and the road was closed for an entire day for the project. Despite being located in a residential area, no complaints were received from residents. The project employed enhanced process management, construction management, and safety management to ensure smooth implementation. As a result of these efforts, the construction was completed without any accidents.

Photo of the site
Certificate of Commendation
Return to List