Construction-related
Nichireki Road Co., Ltd.
Pavement repair work of the Chiba-Togane Road
Kanto Branch of East Nippon Expressway Company
Construction period
From October 6, 2018, to June 26, 2020
Outline of the construction
This construction project is located on the Chiba-Togane Road. It includes the development of accessible Noro Parking facilities in both directions and the creation of green sections within the parking lots. Additionally, it involves pavement repairs and the installation of wire ropes between the Mobara-Kita Interchange and the Mobara-Chonan Interchange on the Ken-o Expressway.
[Noro Parking Area] Service/drainage ditch work : 1,113 m, Water collection chambers : 22 units, Curbstone installation : 336 m, Area of pavement surface repair : 24,688 m², Leveling work : 4,258 t, Area of milling and overlay : 1,685 m², Area of pedestrian pavement work (ILB) : 2,152 m², Road sign installation : 5,896 m, Tree circle installations : 34 locations, Tree planting work : one set, Other miscellaneous work : one set
[Ken-o Expressway] Area of level difference repair (milling and overlay) : 2,658 m², Simplified median strip enhancement work (wire rope) : 4,812 m, Road sign installation : 12,098 m, One set of other miscellaneous work
Reason for the award
The green section renovation project in the Noro Parking Area was completed through meticulous coordination with the client and the design company following the expert review committee’s instructions. Additionally, construction on the Ken-o Expressway was completed within the designated period. The contractor achieved this by expanding the construction team to work within the limited road closure timeframe. This efficient approach facilitated the speedy completion of the entire project. Furthermore, when a typhoon struck the area in October 2019, the contractor participated in road restoration efforts, including cleanup following the highway shutdown. This work helped expedite the early resumption of road services.